Request a Quote

  • General
    Information
  • Vessel's
    Information
  • Operational
    Information
  • Confirm
  • Sent

General Information

Required fields are marked

Your Name
Company
Country
Tel
E-Mail
Project  

Vessel's Information

Ship Type
Deadweight Capacity  DWT
Builder
Mother Yard
Hull Number
Classification Society
Flag State
Built Date
Docking Schedule
Dock Yard
Assigned Engineering Company
Ballast Pump Capacity  (m³/h)×   pump(s)
Explosion Proof
requirement
 
Power Supply (AC)      
Piping diameter of ballast/
de-ballast lines
 A

Operational Information

Required Total Capacity of BWMS
Ballasting:
 (m³/h)
De-Ballasting:
 (m³/h)
Ability to fill Aft Peak Tank
with Main Ballast Pumps
  •  
  • If "No", 
     APT ballast pump capacity(m³/h)
Number of Ballast Pumps
used for Ballasting operation
pump(s)
Required Total Ballast Water Capacity to be treated
Normal
 m³
Heavy (option)
 m³
Eductor Discharge

  • If "Yes", 
     (m³/h)×   pump(s)
Drives Pump de-ballasting & Eductor discharge simultaneously  
Simultaneously Driven Discharge Overboard lines during De-Ballasting line(s)
De-Ballasting by Gravity
  •  
  • If "Yes", Maximum Total Treatement Capacity 
     (m³/h)
Ballasting by Gravity
  •  
  • If "Yes", Maximum Treatment Capacity 
     (m³/h)
Remote Control Unit required?  
Known Trade Route
Frequency of Ballasting Operation  times / year
Others

Sister vessels to be ordered with same BWMS specification

   
If "Yes",  ship(s)

Preferred Disinfctant Type

 

Requests if any

PAGE TOP